Home Page
The Partek Flow Home page is the first page displayed upon login. It provides a quick overview of recent activities and provides access to several system options (Figure 1).
Home Page Icons
Shown at the top of the Home page, the New project button provides a quick link to create a new project in your Partek Flow server. Under the Actions column, the icon <missing icon> allows you to quickly delete projects (Figure 2).
System Options
The drop-down menu in the upper right corner of the Home page (Figure 2) displays options that are not related to a project or a task, but to the Partek Flow application as a whole. This links to the following pages: Settings, Help, Contact Us, Profile and gives you the option to log out of your server.
queued tasks (Figure 6).
users of the Partek Flow instance.
The Display radio buttons enable filtering of the log. All activity will show all the tasks (irrespective of the task owner, i.e. the user starting the task), while My activity lists only the tasks started by the current user. In contrast to the latter, Collaborator’s activity Partek® Flow® Interface 3 activity displays the tasks that are not owned by the current user (but to which the user has access as a collaborator).
The Activity log page also contains a search function that can help to find a particular task (Figure 8). Search can be performed through the entire log (All columns), or narrowed down to one of the columns (using the drop-down list).
Recent Projects, Recent Activities, and Status
The Home page lists the most recent projects that have been performed on the server. By default, the table contains all the projects owned by the current user or ones where the user is a collaborator. The list entries are links that automatically load the selected project.
In the Home page, the table listing all the projects can be sorted by clicking the sort icon <missing icon> to the left of the table headers. By default, the table is sorted by the date when the project was last modified. You can enter project names, owners as well as sample names in the search box to find a specific project (Figure 7).
within the project. On the other hand, the Activity tab lists recent tasks that have been performed in the project.
Additional Assistance
If you need additional assistance, please visit our support page to submit a help ticket or find phone numbers for regional support.
Your Rating: | Results: | 18 | rates |