Partek Flow Documentation

Page tree

Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

This page covers the following topics:

Table of Contents
maxLevel2
minLevel2
excludeAdditional Assistance

Home Page

The Partek® Flow® Home page is the first page displayed upon login. It provides a quick overview of recent activities and provides access to several system options (Figure 1).

 

Numbered figure captions
SubtitleTextPartek Flow Home page
AnchorNameHome Page

Home Page Icons

Shown at the top of the Home page, the New project button provides a quick link to create a new project in your Partek Flow server. Under the Actions column, the iconallows you to quickly delete projects (Figure 2).

 

Numbered figure captions
SubtitleTextMain icons of the Home page allow quick creation and deletion of projects
AnchorNameIcons

System Options

The drop-­down menu in the upper right corner of the Home page (Figure 3) displays options that are not related to a project or a task, but to the Partek Flow application as a whole. This links to the following pages: Settings, Help, Contact Us, Profile and gives you the option to log out of your server.

 

Numbered figure captions
SubtitleTextProgress indicator showing no tasks in progress
AnchorNameProgress indicator

The left­-most icon is the progress indicator, summarizing the current status of the Partek Flow server. If no tasks are being processed, the icon is grey and static and the idle message is shown upon mouse over (Figure 4).

 

Numbered figure captions
SubtitleTextProgress indicator showing Partek Flow server is active
AnchorNameInactive progress indicator

If the server is running, the progress indicator will depict green bars animated on the server icon (Figure 5).

 

Numbered figure captions
SubtitleTextViewing queued tasks
AnchorNameQueued tasks

Selecting the Queue drop­down will list the number of running tasks launched by the user. Additional information about the queue including the estimated completion time as well the total number of queued tasks launched can be obtained by selecting View queued tasks (Figure 6).

 

Numbered figure captions
SubtitleTextActivity log pages shows all the tasks within the projects accessible to the user
AnchorNameActivity log

To view all previous tasks, select the View all activity link. Clicking this link loads the Activity log page (Figure 7). It displays all the tasks within the projects accessible to the user (either as the owner or as a collaborator), including the tasks launched by other users of the Partek Flow instance.

 

Numbered figure captions
SubtitleTextActivity log pages shows all the tasks within the projects accessible to the user
AnchorNameActivity log

The Display radio buttons enable filtering of the log. All activity will show all the tasks (irrespective of the task owner, i.e. the user starting the task), while My activity lists only the tasks started by the current user. In contrast to the latter, Collaborator’s activity displays the tasks that are not owned by the current user (but to which the user has access as a collaborator).

The Activity log page also contains a search function that can help find a particular task (Figure 8). Search can be performed through the entire log (All columns), or narrowed down to one of the columns (using the drop­-down list).

 

Numbered figure captions
SubtitleTextA search term entered in the search box
AnchorNameSearch box

Recent Projects, Recent Activities, and Status

The Home page lists the most recent projects that have been performed on the server. By default, the table contains all the projects owned by the current user or ones where the user is a collaborator. The list entries are links that automatically load the selected project.

In the Home page, the table listing all the projects can be sorted by clicking the sort icon  to the left of the table headers. By default, the table is sorted by the date when the project was last modified. You can enter project names, owners as well as sample names in the search box to find a specific project (Figure 9).

 

Numbered figure captions
SubtitleTextFiltering the Recent project lists based on user’s role
AnchorNameProject filter

Selecting a project will display the Details tab on the right (Figure 10). This shows a preview of the Task graph for the select project, a short description, the members that have access to the project, date last modified, queue status, size and samples contained within the project. On the other hand, the Activity tab lists recent tasks that have been performed in the project.

 

Numbered figure captions
SubtitleTextThe Details and Activity tabs
AnchorNameDetail & activity

Additional assistance

 

Rate Macro
allowUsersfalse