...
Numbered figure captions |
---|
SubtitleText | Task version management page. The table shows one task per row and the current system wide version for each task |
---|
AnchorName | Task management |
---|
|
Image Removed Image Added
|
To enable or disable a task, select or deselect the checkbox next to the Task name on the Task version management page, respectively (Figure 1).
...
Numbered figure captions |
---|
SubtitleText | Choose a new version from the drop-down list |
---|
AnchorName | Version choice |
---|
|
Image Removed Image Added
|
To review which version has been used to perform a task, hover the cursor over the task node and inspect the pop-out balloon (Figure 3). Alternatively, the version number is shown on the Task details (Figure 4) page and the Data summary report (Figure 5).
...
Numbered figure captions |
---|
SubtitleText | Hovering over the task node shows the task version |
---|
AnchorName | Task version |
---|
|
Image Removed Image Added
|
Numbered figure captions |
---|
SubtitleText | The Task details page shows the task version (shown in bold) |
---|
AnchorName | Task detail |
---|
|
Image Removed Image Added
|
Numbered figure captions |
---|
SubtitleText | The Data summary report shows the task version (shown in bold) |
---|
AnchorName | Data summary |
---|
|
Image Removed Image Added
|